From delivery note to test report: traceability for concrete testing labs

Traceability is a chain of small, boring links: a number on a ticket, a label on a cube, a name against a step. Here is the chain end to end.

6 min read

The chain you are trying to prove

A test report is a claim: this concrete, from this delivery, sampled at this time, produced this strength. Everything between the delivery note and the report is the evidence for that claim. If any link is missing — a truck number that cannot be matched, a cube with no label, a result with no technician — the claim weakens, and in a dispute it is the missing link that gets tested, not the average.

Traceability is therefore not a filing exercise. It is the ability to answer, months later, who handled this specimen, where it was stored, which machine crushed it and what was changed afterwards.

Identifiers that survive a working day

Start with a number that is allocated at the point of capture rather than written later: a job or sample reference, a set reference (for example a grade and a sequence within the job) and an individual specimen reference within the set. Those three levels — job, set, specimen — are enough to find any cube without ambiguity.

Then make the physical label as durable as the number. A QR label printed at receipt and stuck on the mould or the cube means the identifier travels with the specimen instead of living only in a book. Scanning it at demoulding, at storage and at test closes three of the easiest places for a mix-up to happen.

Keep the client-side identifiers too: delivery ticket or batch number, truck or vehicle reference, time of batching, and the mix or grade on the ticket. Those are the fields a client will use when they come back with a question.

Capture at receipt

Most of the traceability is won or lost in the first ten minutes. Record when the sample arrived, who delivered it and who received it, the ticket references, the quantity, the age and condition of the concrete, and any observations — a load that arrived late, a slump adjustment on site, a cube that arrived already cast by the client.

If the laboratory did not cast the specimens, say so explicitly and record who did. A cube cast by a contractor and delivered in a bucket is a different evidential object from a cube the laboratory cast itself, and the report should never blur the two.

Who did what, and when

Every state change needs a person and a time: sampled, cast, demoulded, stored, moved between tanks, tested, reviewed, approved, issued. This is the chain of custody, and it is also the first thing an assessor asks about when a laboratory is audited against ISO/IEC 17025 or a client's own quality requirements.

Storage location is part of that chain. A tank or curing room identifier tells you the curing conditions the specimen actually experienced, which is often the difference between explaining a low result and being unable to.

Results that are never quietly overwritten

The most common traceability failure in a laboratory is not a lost label — it is a result that changed without a record. A load keyed in wrong and simply retyped, a cube re-tested and the first attempt forgotten, a report reissued with different numbers and no version.

The defensible pattern is simple: entering a result records the value, the person and the time; correcting it records the previous value, the new value, the reason and the person; and the report that was issued is kept as an immutable snapshot next to later versions. Nothing is deleted to make the file look neater.

The report is the end of the chain, not the start

When the report is generated, it should carry the references it depends on: job, set, specimen identifiers, dates, the method used, the equipment, the reviewer and the approver. That way the report can be verified against the records without reopening the whole job.

Keep issued reports as published copies. If a result is later corrected, the new report supersedes the old one and both remain retrievable, so a client holding last month's copy is never told that the number they have never existed.

A minimum field list

  • Job and sample reference, allocated at capture.
  • Set and specimen identifiers, printed as durable labels.
  • Delivery ticket, batch and vehicle references, with batch time.
  • Sampling party, receipt person and receipt time.
  • Cast, demould, storage and test times, each with a name.
  • Curing location and conditions.
  • Test method, machine and calibration status at test.
  • Result entry and every correction, with reason and user.
  • Reviewer and approver, and an immutable issued report.

Try Simplecrete free for 1 month

The full version, on your own specimens and presses: QR labels, automatic kN capture, calculated MPa and density, pass/fail against the mix target, and a client-ready report.

Full version for 1 month. No card needed.

Your next cube could report itself.Start it today.

Sign up and use the whole platform on your own specimens and presses: QR labels, automatic kN capture, calculated MPa and density, pass/fail against the mix target, and a client-ready report.

Book a demo
Full version for 1 month. No card needed.
Or talk to us